The owners or the developers, through the consultants appointed by them, can submit the application to Air Selangor by forwarding the following documents:
For daily demand less than 225,000 litres, these documents shall be submitted directly to the respective Air Selangor Regional Offices.
For water source applications for daily demand exceeding 4.5 million litres per day (lpd) and to be developed phase by phase, you are required to submit the two (2) sets of Conceptual Design Report for the whole areas, containing the following information:
Note: For factories where the water demands cannot be ascertained, use 75,000 lpd (16, 500 gallons per day) for each hectare of land. If building categories/demands are not available in Table 1, please contact our Planning and Capital Works Department for further information.
The detailed design of water supply systems shall be in accordance with each phase of development. You are required to submit three (3) sets of reports for the detailed design of water supply systems containing the following information:
A copy of Air Selangor’ Standard Specification shall be attached;
The Consultant must submit to the Planning and Development Department of Air Selangor, in the form of CD-R, all drawings related to water supply systems for a particular development pending approval. The said drawings shall include the following:
The Professional Engineers appointed by the owners or the developers shall certify all drawings, calculations and work specification and shall be registered with Air Selangor.
Two (2) sets of the design of pumping systems shall be submitted to the Mechanical and Electrical Section of Air Selangor within four (4) months after the detailed design of reticulation systems had been approved. One (1) copy shall be submitted to the Planning and Capital Works of Air Selangor.
Each proposed design and installation must consist of:
The design and calculation reports shall be prepared by the Mechanical Consultant and certified by a registered Professional Mechanical Engineer.
Prior approval from the Mechanical and Electrical Section of Air Selangor shall be obtained before commencing any work on site.
One (1) set of electrical wiring systems for pump houses shall be submitted to the Mechanical and Electrical Section of Air Selangor.
Telemetry system is needed for a pumping system that exceeds 2.5 million litres per day (MLD) or for a reservoir that exceeds 4.5 MLD.
The telemetry system must be similar to the current system at Air Selangor. For updated information on this system, please liaise with the Telemetry Unit of Air Selangor.
One (1) complete set of the telemetry system must be submitted to the Telemetry Unit of Air Selangor and the installation shall be done by Air Selangor.